VIDA Hotel & Residences Dubai Mall Project
Project Story
In August 2017, Emaar Hospitality Group, the hospitality and leisure subsidiary of Emaar Properties, announced its 7th hotel project in UAE under Vida Hotels and Resorts, along with Harbour Point, a new waterfront lifestyle project. CUMIC had supplied 81.64 MT of hot rolled steel plates in grade: S460NL manufactured by Wuyang Iron & Steel Co., Ltd for the construction of this high-end mall hotel. Complicated Z type sections for the structure of the underground column (covered with cement upon erection) were built from the structural steel plates supplied by CUMIC.
Located in the central area of Dubai, The Vida Dubai Mall will be a two-tower development featuring serviced and branded apartments with 195 hotel rooms, 614 serviced residences, and a direct link to The Dubai Mall. Bordering the vibrant Sheikh Mohammed bin Rashid Boulevard and its myriad of restaurants and cafés, this prime location will allow residents to fully embrace the ‘live, work, play’ lifestyle with uninterrupted views of Burj Khalifa and The Dubai Fountain. We are honored to supply quality steel products for the construction of The Vida Dubai Mall, the perfect upscale addition to Downtown Dubai's sparkling landscape.
- Industry
-
Steel Projects
- FPSOs for the Brazil Offshore Oil Field
- Shema Power Lake Kivu
- Nigeria OML 13
- Cesar Educational Infrastructure Project
- “Almirante Viel” Ice Breaker Building Project
- UMC New Wafer Fab Facility Project
- Jinfei-Maritim 5-Star Apartment Hotel Project
- Bulb Flat Shipbuilding Project
- Equinor Bacalhau - Mooring System Project I&II
- VIDA Hotel & Residences Dubai Mall Project
- Quebrada Blanca Phase 2 Project
- Changhua Offshore Wind Energy Project
- CR102-Bored Tunnel project
- SCA Salvage Tugboat Shipbuilding Project
- Bukit Timah Canal Drainage Improvement Project
- Chile BioBío Railway Bridge building project
- Arturo Merino Benítez International Airport Terminal 2
- Dollarcity Chain Store Construction in Colombia